搜索结果: 1-10 共查到“桥涵工程 Bridge”相关记录10条 . 查询时间(0.061 秒)
《Advances in Bridge Engineering》期刊理事研讨会成功召开(图)
西南交通大学 Advances in Bridge Engineering 理事研讨会 桥梁工程
2020/12/14
2020年12月5日下午,《Advances in Bridge Engineering》(中译名:桥梁工程进展)期刊理事研讨会在西南交通大学成功召开,会议由理事长李亚东教授主持。西南交通大学期刊社原主任宋吉荣教授、期刊社主任李恒超教授、《土木与环境工程学报》胡英奎常务副主编、《Advances in Bridge Engineering》主编李永乐教授、执行编辑汪斌副教授、四川公路桥梁建设集团有...
New 'smart metal' technology to keep bridge operational in next big quake
smart metal technology keep bridge next big quake
2016/11/29
A bridge that bends in an strong earthquake and not only remains standing, but remains usable is making its debut in its first real-world application as part of a new exit bridge ramp on a busy downto...
Field and Analytical Studies of the First Folded Plate Girder Bridge
Field and Analytical the First Folded Plate Girder Bridge
2014/10/22
Integral abutment bridges are very common for short span bridges in the United State due to their less construction and maintenance cost and generally good performance. This thesis studies the first i...
Historic Bridge Evaluation Using Finite Element Techniques
Historic Bridge Evaluation Finite Element Techniques
2014/10/22
The present study examined the application of modern, computer-based analysis methods to two existing historic bridges in Massachusetts. The first bridge featured in this study is the Woronoco Bridge,...
Experiences from Procurement of Integrated Bridge Maintenance in Sweden
bridges maintenance partnering
2009/9/29
The trend in many countries is to outsource maintenance with competitive tendering. The design of the tender is then a crucial issue. A new type of tendering contract, called "Integrated Bridge Mainte...
5th International cofernce on current and future trends in Bridge Design,Construction and Maintenance
5th Bridge Design International cofernce
2008/4/22
The 5th International Conference on Bridge Design, Construction and Maintenance was held in Beijing, China on the 17th – 18th September 2007.
One of the key aims of this series of bridge engineerin...
Model Bridge Contest to be Held at Brookhaven Lab, March 24
Model Bridge Contest Materials
2007/3/14
Bridge future: $100M question: Chronic cracks found in Patroon Island span may require new structure
Bridge transportation
2007/1/23